Quality and documents
Container House Certifications & Quality Control
Review certification discussion, factory inspection, packing checks and export document support before ordering.
- CE / ISO document discussion
- Factory QC before packing
- Shipment photos and loading guidance
CEBy model and market
ISOFactory document support
QCInspection workflow
LoadPacking confirmation

Inspection workflow
Quality control before packing and shipment
1. SpecsConfirm model and documents
2. ProductionFrame and panel checks
3. QCInspection before packing
4. LoadingPacking and container plan
5. SupportRemote installation guidance
Document support
What to confirm before placing an export order
Certification needs depend on product model, configuration, destination market and local project requirements.
Certification checklist
Review CE, ISO, local approval and supplier document questions before placing an export order.
Open checklist
Wind and snow review
Check climate, foundation, anchoring, roof drainage and local engineering questions before confirming production.
Review climate checklist
Fireproof panel review
Compare wall panel material, fire documents, insulation, ventilation and local code questions before quote comparison.
Check panel options
Insulation options
Match wall panels, roof insulation, windows, ventilation and comfort targets to the project climate.
Compare insulation
Factory inspectionFrame, wall panel, roof, floor, doors, windows, packing and loading checks can be reviewed before shipment.
Download resourcesUse the catalog and specification sheet for early supplier comparison and project planning.
Next step
Send product, quantity, country and destination port
Yihong can match model, configuration, loading plan and document support after the first project brief.
Need a container house quote?
Send drawings, use scenario, quantity and destination country.
Get Factory Quote