Expandable Container House Installation Guide: practical buyer notes
Before delivery
Confirm site access, foundation, unloading method and tool list before the container house arrives.
- Check road access and unloading space
- Prepare foundation or support points according to drawings
- Arrange forklift, crane or local team if needed
During installation
The team should follow supplier drawings and guidance, then check alignment, bolts, panels, sealing and drainage.
- Open and position the expandable sections carefully
- Fix structure and roof/wall connections
- Check doors, windows, waterproofing and floor level
After installation
Final checks should cover utilities, safety, ventilation and water leakage before handover.
- Test electrical and plumbing connections
- Inspect sealant, roof drainage and wall joints
- Keep photos and checklist for after-sales support